The difference of water level in the head race and in the tail race a hydroelectric project is known as

ANet head

BOperating head

CGross head

DNone of these

Answer:

C. Gross head


Related Questions:

The longitudinal passage left on the body of the masonry dam for inspection and collection of seepage water is:
Rock fill dam is:
Non-recording rain gauge is more common in India and the one that is most used in India is called the ....................................... gauge.
The sudden rise or heading up of water level on the upstream side of a bridge due to the obstruction caused by the bridge to the flow
The distance between the top of the canal bank and top edge of the cutting is termed as