App Logo

No.1 PSC Learning App

1M+ Downloads
The estimate prepared on the basis of plinth area multiplied by the height of building is

APlinth area estimate

BCentre line method

CCubical content method

DDetailed estimate

Answer:

C. Cubical content method


Related Questions:

The expected out tern of cement concrete 1:2:4 per mason per day is
It is the value at the end of utility period without being dismantled:
The value at the end of the utility period
Art of determining the present value of property is
If the payments of annuity continue for indefinite period, it is called: