App Logo

No.1 PSC Learning App

1M+ Downloads
The excess soil out of cutting for a canal,stacked on the sides is called

ASpoil bank

BEmbankment

CContour bund

DBorrow pit

Answer:

A. Spoil bank


Related Questions:

For the determination of allowable stress in axial compression, Bureau of Indian Standards has adopted
A geological formation, which not only stores water but yield sit in sufficient quantity, is known as:
When a body offers resistance to deformation when acted by external load is called:
The relation between the area irrigated and the quantity of water used is expressed as
The centre of gravity of a right circular hollow cone of diameter and height h lies at a vertical distance of from the base.