App Logo

No.1 PSC Learning App

1M+ Downloads
The excess soil out of cutting for a canal,stacked on the sides is called

ASpoil bank

BEmbankment

CContour bund

DBorrow pit

Answer:

A. Spoil bank


Related Questions:

A curved surface, at which each point is perpendicular to the direction of gravity at that point is called
The most preferred site for intra muscular injection in children is:
When two cross - overs are laid between two tracks, it is known as:
A camber consisting of two straight slopes joining at the centre is called:
Bending moment M and torque T are applied on a solid circular shaft. If the maximum bending stress is equal to maximum shear stress developed, M is equal to: