The expected out turn of 2.5 cm cement concrete flooring per mason per day is

A2.5 sq.m.

B5 sq.m.

C7.5 sq.m.

D10 sq.m.

Answer:

C. 7.5 sq.m.


Related Questions:

The triangular space formed between the extra dos and horizontal line drawn through the crown of arch is called
The exposed vertical surface perpendicular to the door frame is known as
A cut in frame of window to receive the shutter is called
The unit of measurement of plastering is in
The window which is provided on a sloping roof of a building is called: