Challenger App

No.1 PSC Learning App

1M+ Downloads
The first voussoir of arch is called

ASpringer

BCrown

CHaunch

DSpringing point

Answer:

A. Springer


Related Questions:

The curved portion of arch is called
According to Terzaghi, the ultimate bearing capacity of a purely cohesive soil, at ground surface for a rough based footing is:
Which is the part used to transmit the load of the structure to the ground
The span of rubble masonry stone arch is limited up to a length of
The joint thickness of ashlar fine masonry does not exceed: