Challenger App

No.1 PSC Learning App

1M+ Downloads
The Floating mooring does not require

ACables

BAnchors

CBollard

DBuoy

Answer:

C. Bollard


Related Questions:

In the analyses of rates, the provision the provision included, as contractor's profit is:
If the velocity of a body decreases with time, it is called
A low height Wall constructed along the edge of the roof is called
The line joining the points having the same elevation above datum surfaces called a
The minimum width of septic tank is taken