Challenger App

No.1 PSC Learning App

1M+ Downloads
The full width of road acquired before finalizing a highway is:

AWidth Formation

BRoad way

CRight of Way

DCarriage way

Answer:

C. Right of Way


Related Questions:

In water bound macadam road, binding material to hold stone is
According to PIEV theory, the total reaction time of driver is taken as
Which of the following roads are congested during peak house?
The highest point on road surface is called
The essential gradient which has to be provided for the purpose of road drainage is called