Challenger App

No.1 PSC Learning App

1M+ Downloads
The line lying through on a level surface and normal to the Plumb line is

AHorizontal line

BLevel line

CDatum surface line

DNormal line

Answer:

B. Level line


Related Questions:

When a reinforced concrete structure is loaded, the bond resistance developed is due to:
Cage induction motor can be started using
In 18-4-1 HSS (High speed steel ) the percentage of chromium is
The value at the end of the utility period without dismantled is known as
The consumptive use of water for a standing crop is equal to