App Logo

No.1 PSC Learning App

1M+ Downloads
The lowest part of a structure which transmits the load to the soil is known as :

ASuper structure

BPlinth

CFoundation

DBasement

Answer:

C. Foundation


Related Questions:

The maximum differential settlement in isolated footings on clayey soil should be limited to:
Imaginary lines containing vertical joints of masonry is
The highest point of the arch
A sloping surface and it is adopted as a suitable for stair for easy connection between the floors
The type of masonry carried out using a combination of stone masonry with brick masonry or concrete or timber is called: