Challenger App

No.1 PSC Learning App

1M+ Downloads
The method of surveying in which field work and plotting work are done simultaneously is called

APlane tabling

BCompass surveying

CLevelling

DChain surveying

Answer:

A. Plane tabling


Related Questions:

A line in the first quadrant is parallel to HP and inclined to VP, its
One meter is equivalent to
How the temporary hardness of water is removed?
A triangular plate ABC is in the first quadrant the end 'A' is 20 mm, end 'B' is 40 mm and end 'C' is 60 mm above the horizontal plane. The front view of the plate has the shape of.
What is the other name for whipple's procedure?