Challenger App

No.1 PSC Learning App

1M+ Downloads
The perpendicular distance between two gauge lines of a riveted joint is called

APitch

BGauge distance

CEdge distance

DLap width

Answer:

B. Gauge distance


Related Questions:

Construction of temporary structure to support an unsafe structure is known as
The equivalent length of a column, with one end fixed, and the other end free is
Reduced bearing is obtained when the whole circle bearing of a line exceeds
A temporary structure constructed to prevent water from entering an area where a permanent structure is to be constructed
The strain energy stored in a spring when subjected to greatest load without being permanently distorted, is