App Logo

No.1 PSC Learning App

1M+ Downloads
The point up to which plate laying is completed at any time is called

ATerminal

BStation

CBase

DRail head

Answer:

D. Rail head


Related Questions:

SI units of luminous intensity is
When the projectors are parallel to each other and also perpendicular to the plane, the projection is called............................................projection.
One of the methods to set out a perpendicular to the chain line is 3-4-5 method, another method identical to 3-4-5 method is
The volume of water stored between minimum pool level and normal pool level is
An obstacle that obstructs both chaining and ranging is