Challenger App

No.1 PSC Learning App

1M+ Downloads
The process of fixing the sequence of operations and material flow is

AMaster scheduling

BScheduling

CExpediting

DRouting

Answer:

D. Routing

Read Explanation:

Routing is the process of fixing the sequence of operations and material flow in manufacturing. It determines the path and order in which work will be performed.


Related Questions:

Break Even point represents
Tracking signal is used in the context of
In case of batch production the preferred layout will be
Generally, the bill of material does not consist of
MRP-I refers to which of the following?