The process of mixing, transporting, placing and compacting the cement concrete should not take more than

A30 minutes

B60 minutes

C120 minutes

D90 minutes

Answer:

A. 30 minutes


Related Questions:

The main reinforcement in a simply supported RCC member placed at
In a singly reinforced beam, if the permissible stress in concrete reaches earlier than the permissible stress in steel the beam section is called?
Placing of concrete should be done at a temperature
All the type bars are to be struck at
The top diameter, bottom diameter and height of a slump mould are