App Logo

No.1 PSC Learning App

1M+ Downloads
The recommended camber for water bound macadam road is

A1 in 20 to 1 in 24

B1 in 24 to 1 in 30

C1 in 30 to 1 in 48

D1 in 12 to 1 in 15

Answer:

C. 1 in 30 to 1 in 48


Related Questions:

Full amount of super elevation on a horizontal curve is provided at the:
An instrument used for direct measurement which resembles the shape of watch and automatically counts the number of paces:
According to PIEV theory, the total reaction time of driver is taken as
The major structural component of a road composed of stone aggregate is
The width of formation of a road means the width of: