App Logo

No.1 PSC Learning App

1M+ Downloads
The removal of excess chlorine from water is known as

ABreak point chlorination

BSuper chlorination

CDouble chlorination

DDe chlorination

Answer:

D. De chlorination


Related Questions:

If the surveyor gives the signal with both hand above head and then brings them down the indication is
When the bed level of the canal is higher that the HFL of the drainage, shell the structure is said to be:
The surveying used to determine additional details such as boundaries of fields, is called:
The ratio of young's modulus of elasticity for steel to that of concrete is known as
APUPA Pattern is related with which process ?