Challenger App

No.1 PSC Learning App

1M+ Downloads
The signal which indicates whether the platform is clear to receive the train is

AOuter signal

BStarter signal

CHome signal

DGround signal

Answer:

C. Home signal


Related Questions:

If the optimum depth of kor watering for a crop is 15.12cm, the outlet factor for the crop for four week period in hectares per cumec, is
The volume of water stored between minimum pool level and normal pool level is
Life cycle Assessment is widely recognized in association with
1 metric chain, one metre length is divided into
The feminine form of 'master' is