App Logo

No.1 PSC Learning App

1M+ Downloads
The signal which indicates whether the platform is clear to receive the train is

AOuter signal

BStarter signal

CHome signal

DGround signal

Answer:

C. Home signal


Related Questions:

The outlet discharge factor is the duty at the head of:
Which instrument is used forsetting out right angles?
A line is placed in the first quadrant in such a way that the line is inclined to HP and parallel to VP. The elevation will be in
The removal of material from the bed of a channel by flowing water is called
The maximum reinforcement area of tension reinforcement shall not exceed(where 'b' is width and 'd' is total depth of beam)