The size of a room is 5 m x 3 m, thickness of wall 20 cm and a slab projection of 30 cm from walls. If the thickness of slab is 100 mm,the quantity of cement concrete required for room slab

A1.7 m³

B2 m³

C2.4 m³

D1.5 m³

Answer:

C. 2.4 m³