Challenger App

No.1 PSC Learning App

1M+ Downloads
The structure constructed for cross irrigation water over a drain is called

ASuper passage

BLevel cross

CCanal fall

DAqueduct

Answer:

D. Aqueduct


Related Questions:

The buoyant force is
The three phase diagram represents the phase diagram of:
The rounded projected part of the tread beyond the face of the riser is:
Usual concrete mix for RCC roof slab is:
The difference between two measured values of the same quantity is called: