Challenger App

No.1 PSC Learning App

1M+ Downloads
The suitable cross-section of sewers to combined flow is

AEgg shaped section

BHorse shoe section

CParabolic section

DRectangular section

Answer:

A. Egg shaped section


Related Questions:

The gas which is mainly responsible for explosion in sewers is called :
Sewer pipes are made of.
In publics water supply project the coagulation is to be adopted when turbidity of water exceeds
In treating swimming pool, water the filtration system to be used IS
The detention period in a septic tank is: