App Logo

No.1 PSC Learning App

1M+ Downloads
The term implies carefully taking up or down to ground and removing all materials without damage

ADemolishing

BDismantling

CStacking

DRemoving

Answer:

B. Dismantling


Related Questions:

A unit hydrograph of a basin is defined as a hydrograph of direct runoff resulting from rainfall excess of:
In a muff coupling, the outside diameter and the length of themuff are...............and................the diameter of the shaft.
The length of one link in Engineering surveys chain should be
The fundamental principle of surveying is to work from
Unit of RCC work