App Logo

No.1 PSC Learning App

1M+ Downloads
The type of surveying which requires least office work is

Atacheometry

Btrigonometrical levelling

Cplane table surveying

Dtheodolite surveying

Answer:

C. plane table surveying


Related Questions:

Intersection method of detailed plotting is most suitable for
As per Indian standard, length of one link in 30 m his should be
Which meridian changes its position with time?
At magnetic poles, the dip of magnetic needle is
At the magnetic poles, the amount of dip is :