The unit of measurement, for reinforced cement concrete, work is

A1 m^3

B10 m^3

C10 dm^3

Dnone of these

Answer:

C. 10 dm^3


Related Questions:

Curtailment of steel bars, in a beam, is possible, since
The final operation of finishing the concrete surface is
It is observed by the experiment and experience that the volume of dry material required for one m^3 of wet concrete are:
The best wood for sleeper is
A covering of concrete placed on top of an exposed external wall is called