The unit of payment for earth work excavation is

Acubic meters

Bsquare meters

C10 cubic meters

D10 squaremeter

Answer:

C. 10 cubic meters


Related Questions:

Which one of the following parts of the shaper supports the table ?

Directions: In the question below is a statement followed by two conclusions numbered I and II. You have to assume everything in the statement to be true, then consider the two conclusions together and decide which of them logically follows beyond a reasonable doubt from the information given in the statement.

Statement: 

Last year, the total accident count in India was 464,674 which caused 148,707 traffic-related deaths.

Conclusions:

I.   Some of the traffic accidents were fatal.

II.  The bad condition of the road was also responsible for such a high number.

In the reaction, M R= Q*b*d² for the beam design, the letter Q represents, the
For the irrigation of crops the base period B, duty d and Δ are related to as
Maximum frictional force comes to play when a body just begins to slide over the other is