App Logo

No.1 PSC Learning App

1M+ Downloads
The vertical distance a point above the datum is called:

Aelevation

BHeight of instrument

Cstaff reading

Dstaff intercept

Answer:

A. elevation


Related Questions:

The method of surveying used for determining the relative heights of points on the surface of the earth is called
The stone extending throughout the thickness of wall, acts as a bond stone
Venturimeter is used for finding:
Minimum Pitch of rivet in riveted joint is
The softest rock is