App Logo

No.1 PSC Learning App

1M+ Downloads
The vertical distance between the tops of two consecutive treads is

AFlight

BSoffit

CRise

DSpringers

Answer:

C. Rise


Related Questions:

The foundation provided below a heavily loaded steel column on a soil of low bearing capacity is:
The top most course of masonry placed on the top of cornice
An aquifer that is confined at bottom and top is:
The failure of a pile foundation is due to
The wedge shaped brick or stone forming an arch is called