App Logo

No.1 PSC Learning App

1M+ Downloads
The width of opening is called

Aspan

Bspandril

Cspringing line

Dskewback

Answer:

A. span


Related Questions:

A Raft foundation is called floating foundation when:
Higher pitch of roof i) results in stronger roof ii) require more covering material iii) results in weaker roof iv) require less covering material
For masonry work with solid bricks consistency of mortar should be
The most important tool used for brick masonry is :
The maximum settlement of raft foundation on clayey soil should be limited to