App Logo

No.1 PSC Learning App

1M+ Downloads
Weirs constructed on permeable foundation are Likely to fail due to

APiping or uplift

BCrushing

CCracking

DSliding

Answer:

A. Piping or uplift


Related Questions:

Speed of an escalator is usually:
The use of lateral ties in a column is:
The workability of concrete is influenced most by it :
When brick is cut into two halves longitudinally, one part is called:
The pressure piles are type of piles.