What is the main characteristic of a 'Hybrid' renewable power project?

AIt exclusively uses solar energy but is located in a region with high wind potential.

BIt integrates a renewable energy source with a non-renewable source like natural gas for backup.

CIt combines two or more renewable energy sources (e.g., Solar and Wind) in the same location.

DIt solely relies on wind power, but is designed with advanced energy storage capabilities.

Answer:

C. It combines two or more renewable energy sources (e.g., Solar and Wind) in the same location.

Read Explanation:

  • A Hybrid project, particularly in the renewable sector, typically combines complimentary sources like Solar and Wind to provide a more stable power output and better utilization of the grid infrastructure.


Related Questions:

Which among the following was not a target area-oriented special programme introduced during the Special Programmes Phase of decentralized planning?
Which sector is targeted for improvement by the 'Smart crop system'?

Consider the following statements regarding the Environmental Literacy Programme conducted by KSLMA:

  1. The programme primarily focuses on conducting environmental literacy surveys and awareness classes.
  2. Seminars, exhibitions, and classes on waste management were also part of this initiative.
  3. The Environmental Literacy Programme did not include any specific focus on water literacy.

    Which of the following correctly identifies the nature of a knowledge-driven economy?

    1. It is defined by the sheer number of high-tech industries present.
    2. Knowledge acts as a key competitive advantage across all sectors, not just technology-focused ones.
    3. It emphasizes the accumulation of knowledge as the most vital resource for economic success.
    4. Its success hinges on a strong innovation system involving collaboration between firms, research centers, universities, and consultants.
      What is the maximum amount a Gram Panchayat can spend annually on administrative expenses and technical consultancy under JGSY?