Challenger App

No.1 PSC Learning App

1M+ Downloads
When an artificial canal crosses a natural stream above its HFL, the cross drainage work constructed is called

ASupper passage

BAqueduct

CSiphon-aqueduct

DUnder passage

Answer:

B. Aqueduct


Related Questions:

If an object moving along a straight line covers equal distance in equal intervals of time, it is in
The unit weight of steel for RCC
Sadhu Jana Paripalana Yogarn was founded in
The ratio between the two adjacent sides of the drawing sheet
The load required to produce a unit deflection in a spring is called: