Challenger App

No.1 PSC Learning App

1M+ Downloads
When two footing are connected by a beam it is called

ACombined footing

BMat footing

CStrap footing

DStrip footing

Answer:

C. Strap footing


Related Questions:

A horizontal member which is placed across an opening to support the positions structure above it is known as
A full brick which is laid with its length perpendicular to the face of the wall is
Which one is an isolated footing for a column?
The concrete wall of a well foundation is called ____________
The type of masonry carried out using a combination of stone masonry with brick masonry or concrete or timber is called: