Challenger App

No.1 PSC Learning App

1M+ Downloads

Which of the following statements is FALSE regarding the climatic conditions of Montane Wet Temperate Forests?

  1. The mean annual rainfall is between 150 cm and 300 cm.
  2. The mean temperature is between 11°C and 14°C.
  3. The average relative humidity is consistently below 50%.
  4. These forests grow at elevations of 1800 to 3000 meters.

    Aii only

    BNone of these

    Ciii only

    Di only

    Answer:

    C. iii only

    Read Explanation:

    Montane Wet Temperate Forests

    Climatic Conditions

    • Grows at a height of 1800 to 3000 m above sea level

    • Mean annual rainfall is 150 cm to 300 cm and Mean temperature is 11°C to 14°C.

    • Average relative humidity is over 80 per cent.

    Distribution

    • Higher hills of Kerala and Tamil Nadu, in the Eastern Himalayan region.


    Related Questions:

    What is the funding ratio between the Government of India and the states for the Indira Awas Yojana (IAY)?

    1. The Government of India and the states share the costs of the IAY in a 50:50 ratio.
    2. The funding for the IAY is entirely borne by the state governments.
    3. The IAY is funded on a cost-sharing basis between the Government of India and the states in the ratio of 75:25.
      The Angan Jyothi scheme aligns primarily with which broader state initiative aimed at environmental sustainability?

      Consider the following statements about the 'Pouradwani' programme:

      1. Pouradwani is designed to educate the general public on Fundamental Rights and Duties.
      2. The programme aims to raise basic awareness about the Indian Constitution.
      3. Gender perspectives are not a part of the awareness topics covered by Pouradwani.

        In what year was the Food for Work Programme (FFW) merged with the National Rural Employment Programme (NREP)?

        1. The FFW was merged with NREP in 1977.
        2. The merger occurred in 1980.
        3. The scheme was integrated in 1979.
        4. The merger took place in 1981.

          Consider the state of electricity infrastructure in Kerala in 1956.

          1. The total installed electricity capacity in Kerala in 1956 was 89.8 MW.
          2. Electricity distribution was limited to only 846 places across the state.
          3. Kerala had achieved full electrification of all its villages by 1956.