While setting up a plane table at any station

ALevelling is done first

BCentering done first

CBoth levelling and centring are done simultaneously

DOrientation is done first

Answer:

C. Both levelling and centring are done simultaneously


Related Questions:

The binary code is called
The couple of two unlike parallel forces,produces a
The ground water contribution to the stream is known as
The total compressive force at the time of failure of a concrete beam section of breadth "b" without considering the partial safety factor of the material is
The point where the bending moment changes its sign is: