Before testing setting time of cement one should test for
The volume of 50 kg of cement bag is
The final setting time of quick setting cement shall be:
When a brick cut half length wise, then the part of a brick is known as
Which is the main constitution of brick earth among the following
The setting of quick lime is due to the presence of:
Actual size of brick as specified of India Standards is
The overlapping of bricks or stones in masonry is called
A brick which is cut half as width as a fullbrick is called
The weight of one bag of cement
The standard size of a brick is
Refractory bricks resist
When a first class brick is immersed in cold water for 24 hours, its weight should not exceed by
The mixture of different ingredients of cement is burnt at:
Low heat cement is preferred for
If water / cement ratio is 0.5 the quantity of water required for making concrete using one bag of cement, 2 bags of sand and 4 bags of property grade aggregate will be
Duration of hydration of cement lasts
The cubes for testing cement in compression are kept at
In vicat's apparatus, the cement paste is said to be normal consistent if the penetrates from the bottom by.........
Finer the cement
The setting and hardening of cement is due to
The water adding process to convent lime to hydrated lime is
To control the setting time of the cement the ingredient added to clinker during the process of grinding cement
The cement used for water retaining structures and damaged concrete surface repairing work is
The percentage of cement mortar required for R.R masonry is
Cement concrete is strong in
A brick having full length and half width is called
The weight of one cubic meter cement is
Final setting time of ordinary Portland cement is
The degree of grinding of cement is called
For ordinary Portland cement, the initial setting time should not be less than
Longitudinal half section of a brick is called
The process of mixing clay, water and other ingredients to make bricks is known as
The minimum compressive strength expected in first class and second class brick is
Frogs made in the bricks are
When a brick cut off length wise the cut out bricks are called
Final setting time of ordinary Portland cement is
A brick lald with its length parallel to the face or direction of wall
The instrument used to determine the consistency of cement
The lime which are obtained by the calcinations of comparatively pure lime stone is known as
The test conducted to determine the quantity of water to be added in cement to form standard paste
To slow down the initial setting time of cement the compound responsible is
Addition of pozzolona to cement causes all of the following except
A good brick should not absorb water more than
Mortar in which both cement and lime are used as binding material is called
When clay contains excess alumina is used For bricks
An ordinary Portland cement when tested for fineness on IS sieve number 9 will leave residue to an extend of
The setting of hydraulic lime and cement is facilitated by the presence of
Refractory bricks resist
The hydration of cement takes place, in the presence of water, during concrete setting,over a period of