Challenger App

No.1 PSC Learning App

1M+ Downloads
12 പേർ 24 ദിവസം കൊണ്ട് തീർക്കുന്ന ഒരു ജോലി 16 പേർ എത്ര ദിവസം കൊണ്ട് തീർക്കും ?

A15

B20

C18

D16

Answer:

C. 18


Related Questions:

Chain used for survey work in the recent times is
------------------------apparatus is used to test liquid limit of a soil.
In a thin cylinder the ratio between circumferential stress to the longitudinal stress is
In first angle projection method the plane is placed
The best and reliable method to protect building against termites is