Challenger App

No.1 PSC Learning App

1M+ Downloads
A and B can complete a certain task together in 30 days. After A works for 16 days, B is left to finish the remaining work by himself in 44 days. How many days would it take for B to complete the entire task on his own?

A40 days

B50 days

C60 days

D70 days

Answer:

C. 60 days

Read Explanation:

Let A's one-day work = (a) and B's one-day work = (b).

Since they complete the work together in 30 days,

a+b=130a+b=\frac{1}{30}

A works alone for 16 days, so work done by A:


16a

The remaining work is completed by B alone in 44 days, so the remaining work is:


44b

Hence,


16a + 44b = 1

Substitute (a=130b):(a=\frac{1}{30}-b):

16(130b)+44b=116\left(\frac{1}{30}-b\right)+44b=1

1630+28b=1\frac{16}{30}+28b=1
815+28b=1\frac{8}{15}+28b=1

28b=71528b=\frac{7}{15}
b=7420=160b=\frac{7}{420}=\frac{1}{60}

Therefore, B alone can complete the entire task in


60 days\boxed{60\text{ days}}


Related Questions:

The power consumption of an electrical device varies directly with the square of the voltage applied. If a device consumes 150 watts when the voltage is 120 volts, how much power (in watts) will it consume at 240 volts?
A can count 100 eggs in 4 minutes while B can count the same number of eggs in 5 minutes. How much time will be required if they work together to count 450 eggs?
24 പുരുഷന്മാർക്ക് ഒരു ജോലി 10 ദിവസം കൊണ്ട് പൂർത്തിയാക്കാമെങ്കിൽ 30പേർക്ക് എത്ര ദിവസം വേണ്ടി വരും?
P can complete a round of circular track in 1 minute and 30 seconds while Q can complete a round in 45 seconds. If they start moving from the same point and move in opposite directions, then they meet after _ seconds.
Pravin can do a piece of work in 6 hours. Rishi can do it in 28 hours. With the assistance of Shan, they completed the work in 4 hours. In how many hours can Shan alone do it?