A and B can do a piece of work in 10 days, B and C in 15 days and C and A in 20 days. C alone can do the work in :

A60 days

B80 days

C120 days

D30 days

Answer:

C. 120 days

Read Explanation:

Total work = LCM (10, 15, 20) = 60 Efficiency of A + B = 60/10 = 6 Efficiency of B + C = 60/15 = 4 Efficiency of C + A = 60/20 = 3 Efficiency of [A + B + B + C + C + A ] = 6 + 4 + 3 = 13 Efficiency of 2[ A + B + C ] = 13 Efficiency of [ A + B + C ] = 13/2 Efficiency of C = Efficiency of [ A + B + C ] - Efficiency of [ A + B ] = 13/2 - 6 = (13 - 12)/6 = 1/6 Time taken by C alone to do the work = 60/(1/6) = 120 days


Related Questions:

A work could be completed in 22 days. However due to three workers being absent, it was completed in 24 days. The original number of workers was.
In a race, an athlete covers a distance of 360 m in 60 sec in the first lap. He covers the second lap of the same length in 180 sec. What is the average speed (in m/sec) of the athlete?
ഒരു പുരുഷനും സ്ത്രീക്കും അവർ ഒരുമിച്ച് ചെയ്ത ജോലികൾക്ക് 20 ദിവസത്തേക്ക് 1500 രൂപ വേതനം ലഭിച്ചു. പുരുഷന്റെ കാര്യക്ഷമത സ്ത്രീയുടേതിനേക്കാൾ ഇരട്ടിയാണെങ്കിൽ, സ്ത്രീയുടെ ദൈനംദിന വേതനം കണ്ടെത്തുക?
A and B together can do a certain work in x days. Working alone, A and B can do the same work in (x + 8) and (x + 18) days, respectively. A and B together will complete 5/6 of the same work in:
After 60 litres of petrol was poured into an empty storage tank, it was still 10% empty. How much petrol (in litres, rounded off to two decimal place) must be poured into the storage tank in order to fill it?