Challenger App

No.1 PSC Learning App

1M+ Downloads
A hydrograph is a plot of:

APrecipitation against time

BSurface run off against time

CRecorded run off against time

DStream flow against time

Answer:

D. Stream flow against time


Related Questions:

The distance between the top of the canal bank and top edge of the cutting is termed as
When a small irrigation canal has to cross over a median drain we construct:
What the side slope of a Cipolettiiweir?
The longitudinal passage left on the body of the masonry dam for inspection and collection of seepage water is:
The margin between crest of a dam or canal bank and full supply level is: