Challenger App

No.1 PSC Learning App

1M+ Downloads
Abhay and Bharat can complete a certain piece of work in 17 and 10 days, respectively, They started to work together, and after 3 days, Bharat left. In how many days will Abhay complete the remaining work?

A1513/172

B1513/170

C1511/170

D1515/171

Answer:

B. 1513/170

Read Explanation:

1513/170


Related Questions:

A juice vendor mixes water with pure orange juice. If he sells the mixture at the cost price of pure orange juice and makes a profit of 20%, what is the ratio of water to pure orange juice in the mixture, respectively?
60 ആളുകൾ 10 ദിവസം കൊണ്ട് തീർക്കുന്ന ജോലി 6 ദിവസം കൊണ്ട് തീർക്കാൻ എത്ര ആളുകൾ അധികം വേണ്ടിവരും ?
A 100-litre solution contains acid and water in the ratio 3:2. Some quantity of this solution is removed and replaced with pure acid. If the final ratio of acid to water becomes 7:3, how many litres of solution were replaced?
A pipe can fill a tank in 9 hours. Another pipe can empty the filled tank in 63 hours. If both the pipes are opened simultaneously, then the time (in hours) in which the tank will be two-third filled, is:
A can do a piece of work in 10 days. He works at it for 4 days and then B finished the remaining work in 9 days. How long will they take to complete the work if they do it together?