In long and short wall method of estimation,the length of long wall is the centre to centre distance between the walls and

ABreadth of the wall

BHalf breadth of wall on each side

COne fourth breadth of wall on each side

DNone of these

Answer:

B. Half breadth of wall on each side


Related Questions:

Which department looks after the execution and maintenance of water supply and sanitary works?
In critical path method the performance of a specific task is called
Work-charged establishment a percentage of ............................ to............................ of the estimated cost is included in the estimated.
For compacting the quantity of earthwork using prismoidal formula the number of required sectional area
The drawings essentially to be enclosed with the Preliminary estimate