Positive slack in PERT indicates

AAhead of schedule

BBeyond of schedule

CAs per schedule

DCritical Path

Answer:

A. Ahead of schedule

Read Explanation:

Positive slack indicates that the project is ahead of schedule and has excess resources. It is the difference between the latest allowable occurrence time and the earliest expected time. The equation for slack is Slack = TL - TE. When TL is greater than TE, the slack is positive. Zero slack means the project is on schedule, while negative slack indicates the project is behind schedule due to a lack of resources.


Related Questions:

A point which represents either starting or termination of activity is known as -
In linear programming problem when does feasibility change?

Consider the following statements regarding linear programming:Which of the given statements are correct?

  1. The graphical method cannot solve a linear programming problem with three variables and two constraints.
  2. In the Big-M method, when the artificial variable leaves the basis, its column can be deleted from the subsequent tables.
  3. When one constraint line comes parallel to the objective function line, LPP will have a degenerate solution.
    In PERT analysis, the possible number of time estimates for activities linking up two events are -
    Which of the following is NOT a method of solving the transportation problem?