App Logo

No.1 PSC Learning App

1M+ Downloads
Process layout is employed for:

Abatch production

Bcontinuous type of product

Ceffective utilisation of machine

Dall of the above

Answer:

A. batch production

Read Explanation:

Process layout is recommended for batch production, where machines performing similar operations are grouped together. This layout is used when production volume is not sufficient for a product layout. On the other hand, product layout is preferred for continuous production, where machines are arranged in the sequence of operation on raw material.


Related Questions:

The basic purpose of multiple activity chart is to

Scheduling___________________________

  1. is a general timetable of manufacturing
  2. is the time phase of loading
  3. is loading all the work in process on machines according to their capacity
    Market survey is a/an____________________method of forecasting.
    Delphi technique is a_____________________method of forecasting
    Which one of the following is not a technique under Predetermined Motion Time System (PMTS)?