App Logo

No.1 PSC Learning App

1M+ Downloads

Regarding the infrastructure and connectivity for the e-Health Kerala Project, which statements are correct?

  1. IT infrastructure, including LAN, UPS, and necessary hardware, is established at all healthcare facilities to support e-Health.
  2. All hospitals are connected to the e-Health Cloud Server via leased line connections, ensuring a stable link.
  3. Redundancy is built into the connectivity, with both primary and secondary links provided to ensure uninterrupted service.
  4. The KSWAN backbone is utilized for connectivity, with final connections often provided by BSNL Fiber Optic links.

    A3 only

    BAll of these

    C2 only

    D4 only

    Answer:

    B. All of these

    Read Explanation:

    The e-Health Kerala Project relies on a robust IT infrastructure and reliable connectivity to function effectively. Each hospital is equipped with essential IT components such as a Local Area Network (LAN), uninterruptible power supply (UPS) systems, and necessary hardware. Connectivity to the central e-Health Cloud Server is primarily achieved through leased line connections. To guarantee service continuity, redundant connectivity is established, offering both a primary and a secondary link. The Kerala State Wide Area Network (KSWAN) forms the backbone of this connectivity, with final connections often facilitated by BSNL's Fiber Optic network.

    Related Questions:

    What models are often used to secure private sector investment in e-governance?

    Consider the following statements about the RuPay payment network:

    1. RuPay was developed to reduce India's dependence on physical cash and promote digital transactions.
    2. The network prioritizes a high level of security to safeguard users against fraud.
    3. RuPay is a recent initiative with limited acceptance only in major metropolitan areas.
    4. It is a joint venture between the Indian government and several private technology firms.
      Access to a patient's health data via the ABHA number requires:
      The e-Courts project, an Integrated MMP, aims to improve efficiency and access to what?

      Which of the following statements accurately describe the necessary changes for effective e-governance implementation?

      1. Updating laws to legalize digital signatures and online transactions is essential for e-governance.
      2. E-governance requires empowering employees at lower levels with decision-making autonomy.
      3. Changing the mindset of all stakeholders, including citizens and employee unions, is not critical for e-governance adoption.
      4. Resistance from vested interests in the legislature and executive is a common challenge in e-governance reforms.