Challenger App

No.1 PSC Learning App

1M+ Downloads
Ramanan and Shyam together can do a work in 8 days. Both of B them began to work. After 3 days Ramanan fell ill, Shyam completed the remaining work in 15 days. In how many days can Ramanan complete the work?

A12

B15

C16

D17

Answer:

A. 12


Related Questions:

A pipe can fill a tank in 9 hours. Another pipe can empty the filled tank in 36 hours. If both the pipes are opened simultaneously, then the time (in hours) in which the tank will be two-third filled, is
Abhinav, Bikash and Chetan can complete a piece of work in 16 days, 24 days and 32 days respectively. If Bikash leaves 2 days before completion of the work, then find the total days required to complete the work.
A pipe can fill a tank with water in 3 hours. Due to leakage in bottom, it takes 3 ½ hours to fill it. In what time the leak will empty the fully filled tank ?
ഒരു ക്ളോക്കിൽ 12 അടിക്കാൻ 22 സെക്കന്റ് സമയമെടുക്കും.6 അടിക്കാൻ എത്ര സെക്കന്റ് സമയം വേണം ?
In a computer game, a builder can build a wall in 20 hours while a destroyer can completely demolish such a wall in 40 hours. In the beginning, both builder and destroyer were set to work together on a basic level. But after 30 hours the destroyer was withdrawn. What was the total time taken to build the wall?