The implementation of the Transgrid 2.0 project is expected to result in a significant:

AIncrease in electricity generation capacity (measured in MW).

BReduction in transmission and system energy losses (measured in MW/MU).

CImprovement in the efficiency of power distribution networks (measured in % losses).

DExpansion of the state's renewable energy portfolio (measured in MW/MU).

Answer:

B. Reduction in transmission and system energy losses (measured in MW/MU).

Read Explanation:

  • By installing higher capacity lines and new substations closer to load centres, the transmission efficiency improves significantly, directly leading to a reduction in technical transmission losses in the grid.


Related Questions:

What is the primary objective of the National Social Assistance Programme (NSAP)?

  1. To ensure a minimum national standard for social assistance.
  2. To provide employment opportunities in rural areas.
  3. To promote urban development projects.
  4. To regulate financial markets.
    Which zone in Kerala has the highest population density?
    What was done with surplus land exceeding the land ceiling in Kerala's land reforms?
    Which key deprivation indicators were used to identify extremely poor households in the programme?
    Which of the following statement is true with regard to demographic transition in Kerala ?