App Logo

No.1 PSC Learning App

1M+ Downloads
The margin between crest of a dam or canal bank and full supply level is:

AFree board

BFlash board

CHead -race

DTail - race

Answer:

A. Free board


Related Questions:

River forms meander in
The longitudinal passage left on the body of the masonry dam for inspection and collection of seepage water is:
Rock fill dam is:
The rainfall hyetograph shows the variation of which one of the following?
Under which group, does waviness in surface falls?