The method of surveying in which field work and plotting work are done simultaneously, is called

APlane table surveying

BChain surveying

CLeveling

DCompass surveying

Answer:

A. Plane table surveying


Related Questions:

The type of surveying which requires least office work is
The horizontal angle between true meridian and magnetic meridian
A line normal to the plump line at all points is known as :
If in a closed traverse, sum of north latitudes is more than the sum of the South latitudes and also that the sum of west departures is more than the sum of east departures, the bearing of the closing line lies in the
If the magnetic bearing of the sun at a place at noon in Southern hemisphere is 167°, the magnetic declination at that place is