The primary and overarching objective of the Transgrid 2.0 project is:

ATo reduce the dependency on fossil fuels by increasing renewable energy integration.

BTo implement a smart grid system for real-time monitoring and control of the power network.

CTo enhance the inter-state power transmission capacity to facilitate national grid stability.

DTo strengthen the intra-state power transmission network for seamless power flow.

Answer:

D. To strengthen the intra-state power transmission network for seamless power flow.

Read Explanation:

  • Transgrid 2.0 is fundamentally a transmission network strengthening project (intra-state).

  • Its main goal is to create high-capacity corridors, ensuring constraint-free transportation of bulk power from import nodes (like Madakkathara) to all load centers within Kerala.


Related Questions:

The 'Kerala Model of Development' is best known for its focus on:
What is the typical range of subsidy offered to farmers for the solar pump sets under the 'Soura Jalanidhi' scheme?

What are the primary reasons for poverty in Kerala?

  1. The state has failed to create sufficient job opportunities despite economic exposure and remittances.
  2. Inequality between the rich and the poor is decreasing in Kerala.
  3. Rural poverty rates are lower than urban poverty rates in Kerala.
  4. There is a strong correlation between poverty and proximity to forest areas.
    What was one of the key initiatives under the SHE program?
    In the context of the overall telecom ecosystem, K-FON primarily functions as a/an: