Challenger App

No.1 PSC Learning App

1M+ Downloads
The primary and overarching objective of the Transgrid 2.0 project is:

ATo reduce the dependency on fossil fuels by increasing renewable energy integration.

BTo implement a smart grid system for real-time monitoring and control of the power network.

CTo enhance the inter-state power transmission capacity to facilitate national grid stability.

DTo strengthen the intra-state power transmission network for seamless power flow.

Answer:

D. To strengthen the intra-state power transmission network for seamless power flow.

Read Explanation:

  • Transgrid 2.0 is fundamentally a transmission network strengthening project (intra-state).

  • Its main goal is to create high-capacity corridors, ensuring constraint-free transportation of bulk power from import nodes (like Madakkathara) to all load centers within Kerala.


Related Questions:

About how many local governments exist in Kerala under the decentralized model?

Which of the following statements is FALSE regarding the climatic conditions of Montane Wet Temperate Forests?

  1. The mean annual rainfall is between 150 cm and 300 cm.
  2. The mean temperature is between 11°C and 14°C.
  3. The average relative humidity is consistently below 50%.
  4. These forests grow at elevations of 1800 to 3000 meters.
    Which of the following illustrates deep-seated gender discrimination and inequality in India?
    What practice did the new DRDA Administration scheme replace?
    What is the term for the system that allows the transmission of television signals via a satellite dish directly to a subscriber's home in India?