The sloping top surface of parapet wall is called:

Adiaper work

Bblock in course

Cparapet wall

Dcoping

Answer:

D. coping

Read Explanation:

• Top of the parapet wall kept inclined or sloped surface for easy drain of off water is known as weathering


Related Questions:

The heading of water above its normal level while passing under the bridge is known so :
The number of standard bricks required for 1m³ of brick masonry is
The minimum thickness of stone masonry is
A type of bond in a brick masonry in which each course consist of alternate headers and stretchers is called
To keep bond, in successive course of a wall, a piece of bricks is generally provided at the end of the courses is called