App Logo

No.1 PSC Learning App

1M+ Downloads
The use of check line is:

ATo check the accuracy of the work

BIt helps plotting work

CTo locate interior details

DIt helps triangulation

Answer:

A. To check the accuracy of the work


Related Questions:

What is the other name for whipple's procedure?
When a small angular displacement is given to a body, floating in a liquid, it starts oscillating about some point. This point is called:
Water from the following source is likely to be hard
Which of the following is the accurate method for plotting traverse area?
Two vectors are equal if they have